Solenoid Coil Test Weekly Meeting
Location and Time
- Fri 10-Jun-2011 9:30 am ARC 231
Agenda
- Close out P6 solenoid task
- order everything!
- Lessons learned from Coil 3
- do we need to add or change anything?
- Coil 2 status
- installation status
- hi-pot results
- cooldown timeline
- subcoil inductances and quench detector
- Danfysik fault sequencer and slow dump
- additional PLC and HMI programming
- network loss problem?
- fast DAQ
- replace smaller UPS
- anything else?
- Documentation
- trip chains
- anything else?
- Will there be any auxiliary tests?
- To-do list for the next coil
- measure UPS lifetime under operating conditions
- IRMIS at JLab
- filled with BNL "training" data
- Order all controls equipment so project line can be closed out
- Mantis Task Tracker
- Preparing for moving into the hall