* Preparing for moving into the hall
+
* Order all controls equipment so project line can be closed out
** order all controls equipment so P6 line can be closed
+
 
* [http://halldweb1.jlab.org/mantisbt Mantis Task Tracker]
 
* [http://halldweb1.jlab.org/mantisbt Mantis Task Tracker]
 +
* Preparing for moving into the hall

Revision as of 17:03, 7 June 2011

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 10-Jun-2011 9:30 am ARC 231


Agenda

  • Lessons learned from Coil 3
    • do we need to add or change anything?
  • Coil 2 status
    • installation status
    • hi-pot results
    • cooldown timeline
    • subcoil inductances and quench detector
    • Danfysik fault sequencer and slow dump
    • additional PLC and HMI programming
      • network loss problem?
    • fast DAQ
    • replace smaller UPS
    • anything else?
  • Documentation
    • trip chains
    • anything else?
  • Will there be any auxiliary tests?
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • IRMIS at JLab
    • filled with BNL "training" data
  • Order all controls equipment so project line can be closed out
  • Mantis Task Tracker
  • Preparing for moving into the hall