Difference between revisions of "Mar 17, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 30: | Line 30: | ||
##* Consideration for optimum placement of LED boards on detector, including possibly attaching 2 fibers to each LED | ##* Consideration for optimum placement of LED boards on detector, including possibly attaching 2 fibers to each LED | ||
##* UofR will come up with some sketches that can be passed on to our designers to verify geometry | ##* UofR will come up with some sketches that can be passed on to our designers to verify geometry | ||
− | |||
− | |||
− | |||
# BCAL | # BCAL | ||
## Construction Status: builds, fibre QA | ## Construction Status: builds, fibre QA | ||
## First article testing (Yi) [http://www.jlab.org/~sipm_daq/Results Result Page] | ## First article testing (Yi) [http://www.jlab.org/~sipm_daq/Results Result Page] | ||
+ | # FCAL | ||
+ | ## Construction Status: mechanical, bases - no report | ||
+ | ## Drawings for Fcal structure (Tim) [http://www.jlab.org/~whitey/FCAL Sketches for comments on FCAL structure] | ||
+ | #* Following the last meeting, Tim, Wayne, Matt and John met to go over details | ||
+ | ##* Decision to stiffen support structure. Tim and Wayne have had discussions with designers of the support frame for the JLab Big-Cal support structure, who provided feedback to our concept | ||
+ | ##* IU will build a prototype to test the layout with two rows of 20 bars, which will take 4 weeks. | ||
+ | ##* Fabrication of parts will follow after incorporating feedback from the prototype. | ||
# Simulations | # Simulations | ||
## [http://www.jlab.org/~semenov/meeting110317.pdf Readout segmentation] (Andrei) | ## [http://www.jlab.org/~semenov/meeting110317.pdf Readout segmentation] (Andrei) |
Revision as of 13:11, 17 March 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: check cross talk of calibration inputs across modules.
- Fcal construction
-
JLab to provide shipping guidelines to Matt
-
Tentative Agenda
- Announcements
- Starting next week, we will move the Bcal Readout meeting and Cal Working Group meetings to TUESDAY 11:00
- Review of Action Items
- Calibration
- Concept for Fcal settled
- Discussions on Bcal option underway
- Will present concept to this group at next meeting (Mar 29)
- Modifications include daisy-chaining LED boards together
- Use CAN bus to communicate with control boards
- Consideration for optimum placement of LED boards on detector, including possibly attaching 2 fibers to each LED
- UofR will come up with some sketches that can be passed on to our designers to verify geometry
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi) Result Page
- FCAL
- Construction Status: mechanical, bases - no report
- Drawings for Fcal structure (Tim) Sketches for comments on FCAL structure
- Following the last meeting, Tim, Wayne, Matt and John met to go over details
- Decision to stiffen support structure. Tim and Wayne have had discussions with designers of the support frame for the JLab Big-Cal support structure, who provided feedback to our concept
- IU will build a prototype to test the layout with two rows of 20 bars, which will take 4 weeks.
- Fabrication of parts will follow after incorporating feedback from the prototype.
- Simulations
- Readout segmentation (Andrei)
Minutes
Attending: