Difference between revisions of "Feb 17, 2011 Calorimetry"
From GlueXWiki
Line 42: | Line 42: | ||
=Minutes= | =Minutes= | ||
''Attending: | ''Attending: | ||
+ | |||
+ | ''Attending: Elton, Yi, tim, John, Beni, David, Tim, Elton (JLab); Zisis, Andrei (UofR); Ryan, Matt (IU); Christina, George (Athens); Will (USM). | ||
+ | |||
+ | # Announcements | ||
+ | #* Zisis and student will present talks on the Bcal and proposed SiPM studies at the [ http://www.sno.phy.queensu.ca/wnppc09/ The 46th Winter Nuclear and Particle Physics Conference]] | ||
+ | # Review of Action Items | ||
+ | # Calibration | ||
+ | # FCAL | ||
+ | ## Construction Status: mechanical, bases | ||
+ | # BCAL | ||
+ | ## Construction Status: builds, fibre QA | ||
+ | # Simulations | ||
+ | ## Readout segmentation (summing, towers vs quadrants/blocks) | ||
+ | ## Reconstruction: [http://www.jlab.org/~semenov/meeting110217.pdf Study of Segmentation with BCal Reconstruction Code] | ||
+ | # Other Updates | ||
+ | |||
+ | <hr> | ||
+ | Splitoffs discussion: | ||
+ | |||
+ | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1499 slides] (from May 2010 collab. meeting) |
Revision as of 15:12, 17 February 2011
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
- Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system.
- IU: checking cross talk of calibration inputs across modules.
- Fcal construction
-
Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. -
Zisis/George to send Elton shipping specifications as example for specifying Pb shipments - Mechanical: Tim has promised review of support structure.
-
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction: Study of Segmentation with BCal Reconstruction Code
- Other Updates
Splitoffs discussion:
- slides (from May 2010 collab. meeting)
Minutes
Attending:
Attending: Elton, Yi, tim, John, Beni, David, Tim, Elton (JLab); Zisis, Andrei (UofR); Ryan, Matt (IU); Christina, George (Athens); Will (USM).
- Announcements
- Zisis and student will present talks on the Bcal and proposed SiPM studies at the [ http://www.sno.phy.queensu.ca/wnppc09/ The 46th Winter Nuclear and Particle Physics Conference]]
- Review of Action Items
- Calibration
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- Simulations
- Readout segmentation (summing, towers vs quadrants/blocks)
- Reconstruction: Study of Segmentation with BCal Reconstruction Code
- Other Updates
Splitoffs discussion:
- slides (from May 2010 collab. meeting)