- Chris: by Wednesday we will have all the PCBs populated. The company sent two pictures (link above) showing delaminations on two of the boards. They claim the delamination was there when the boards arrived. But Chris would have seen it!? Roger: the heating cycle they use may cause delamination. Chris will ask | - Chris: by Wednesday we will have all the PCBs populated. The company sent two pictures (link above) showing delaminations on two of the boards. They claim the delamination was there when the boards arrived. But Chris would have seen it!? Roger: the heating cycle they use may cause delamination. Chris will ask | ||
− | the company for information about this. | + | the company for information about this. |
− | - Roger: the cathode foil Gerber files will be sent right after the meeting. The extra connectors were included. | + | - Ultrasonic cleaning: according to Chris 6.6gal Vigon costs $285; we need 14gal. Not clear how often we have to change it. |
+ | |||
+ | - Roger: the cathode foil Gerber files will be sent right after the meeting. The extra connectors were included. Will have the first article by Dec 3. | ||
+ | Roger got two quotations and two "no-bids" for the rigid-flex which is good enough for the submission of the PR tomorrow. | ||
− | - | + | - |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Engineering == | == Engineering == |
Revision as of 17:20, 4 November 2010
November 4, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Blue Crab status
- Frame lamination
- Electronics (Fernando, Chris, Roger)
- Update on PCBs: delaminated PCB1 and PCB2
- Cathode foil and rigid-flex procurement
- Cathode foil inspection plan
- Engineering (Bill, David)
- Wire stringing status; position measurement system.
- Other
- Full-scale prototype tests
- status, timing with fADC125 (Beni)
- wire offset studies (Lubomir)