Difference between revisions of "Sep 2, 2010 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 31: | Line 31: | ||
# BCAL | # BCAL | ||
## Construction Status | ## Construction Status | ||
− | ## Cosmic-ray normalization runs | + | ## Cosmic-ray normalization runs ([[Media:Cal_meet100902.pdf]]) |
## Brief update on SiPM tests | ## Brief update on SiPM tests | ||
# Simulations | # Simulations |
Revision as of 21:56, 1 September 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
- Fcal
- Elton and Ashot to meet and resolve any discrepancies between the simulations.
- Bcal
- Report cosmic-ray normalization of energy conversion to photons.
- SiPM evaluations
- UofR: Complete cosmic-ray energy calibration.
- IU:
a) take into account 5 times lower rate in upstream compared to downstreamb) geometry for summed units - JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL
- Construction status
- To shashlyk or not to shashlyk.
- BCAL
- Construction Status
- Cosmic-ray normalization runs (Media:Cal_meet100902.pdf)
- Brief update on SiPM tests
- Simulations
- Agenda for GlueX-Collaboration-Sep-2010
- Other Updates
Minutes
Attendees: