Difference between revisions of "Minutes-8-19-2010"
From GlueXWiki
Line 6: | Line 6: | ||
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | #* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | ||
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list] | #* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list] | ||
− | # Electronics: update (Fernando) | + | # Electronics: update (Fernando) |
# Engineering | # Engineering | ||
− | #* Cathode foil: | + | #* Cathode foil: procurement status (Roger) |
− | + | ||
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
# Full-scale prototype tests [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 509-512]] | # Full-scale prototype tests [[http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 509-512]] |
Revision as of 17:56, 17 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- clean room requirement changes: Ron Bartek's suggestions
- equipment/materials needed for the production David's list
- Electronics: update (Fernando)
- Engineering
- Cathode foil: procurement status (Roger)
- Wire stringing update (Bill)
- Full-scale prototype tests [FDC Log Book, pages 509-512]
- oxygen contamination measurements (Beni)
- cosmic test update (Beni)
- wire resolution results
- Other: FDC paper