Difference between revisions of "August 4, 2010 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 19: Line 19:
 
# CDC Update  
 
# CDC Update  
 
## Update on the new straws ([http://www.halld.org/CDC Pictures]).
 
## Update on the new straws ([http://www.halld.org/CDC Pictures]).
 
+
### The scratches are gone.
 +
### Acceptance rate has been 104 out of 108 straws. After cutting open the three rejects, we concluded that they also would have been acceptable. The one failure is a glue blemish on the straw.
 +
### The straws are much cleaner than anything we have seen before, so we are looking modifying our cleaning procedure.
 +
### Lamina told us the straws are manufactured in a clean room and any dust we see can only be mylar dust ( and we do not see very much at all).
  
 
# AOT
 
# AOT
  
 
== Minutes ==
 
== Minutes ==

Revision as of 11:00, 3 August 2010

Meeting Time and Place

Wednesday August 4, 2010 at 11:00am At Jefferson Lab, the meeting will be held in room F326-327

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")

Agenda

  1. Announcements
  2. FDC Update logbook
  3. CDC Update
    1. Update on the new straws (Pictures).
      1. The scratches are gone.
      2. Acceptance rate has been 104 out of 108 straws. After cutting open the three rejects, we concluded that they also would have been acceptable. The one failure is a glue blemish on the straw.
      3. The straws are much cleaner than anything we have seen before, so we are looking modifying our cleaning procedure.
      4. Lamina told us the straws are manufactured in a clean room and any dust we see can only be mylar dust ( and we do not see very much at all).
  1. AOT

Minutes