Difference between revisions of "Minutes-7-29-2010"
From GlueXWiki
Line 11: | Line 11: | ||
# Engineering | # Engineering | ||
#* Cathode foil procurement (Roger) | #* Cathode foil procurement (Roger) | ||
− | #* Wire stringing update (Bill); [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg | + | #* Wire stringing update (Bill); UVA stuff: [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg 1] (38.25"+0.5"), [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup2.jpg 2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup3.jpg 3], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup4.jpg 4] |
#* Cathode frame prototyping | #* Cathode frame prototyping | ||
# Full-scale prototype tests | # Full-scale prototype tests |
Revision as of 16:21, 28 July 2010
July 29, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planing status 5 techs production schedule
- Electronics (Fernando)
- new PCB tests
- other updates: cable procurement, fADC
- Engineering
- Full-scale prototype tests
- discussions about gas mixture and field configuration (Lubomir)
- cosmic test update (Beni) FDC Log Book, pages 505
- oxygen contamination measurements (Beni) Beni's scheme
- Other