Line 33: | Line 33: | ||
- The strongbacks are being shipped from IUCF, will have them in a week or two. Bill wanted to have sketches or pictures of the position and tension measuring systems. Lubomir will contact UVA. | - The strongbacks are being shipped from IUCF, will have them in a week or two. Bill wanted to have sketches or pictures of the position and tension measuring systems. Lubomir will contact UVA. | ||
− | |||
- The two Liping's students are busy with PRIMEX. We should start cutting the rohacells when we have people available. | - The two Liping's students are busy with PRIMEX. We should start cutting the rohacells when we have people available. | ||
== Electronics == | == Electronics == | ||
− | - Fernando: we | + | - Fernando: we don't have yet the first article PCBs. Recently space was freed in F117 for the PCB testing. They are interviewing people for a tech position, to work on the testing. |
+ | |||
+ | - fADC: Gerard has now a version of the firmware that works at high rates. There's also no need to download the firmware from a computer, it loads from the EPROM on the module. | ||
== Engineering == | == Engineering == |
Revision as of 22:48, 22 July 2010
July 22, 2010 FDC meeting
Tentative Agenda
- Announcements
- Production
- 727 B.C. status
- production planing: 5 techs production schedule
- Electronics: update (Fernando)
- Engineering
- Cathode foil: update (Roger)
- Wire stringing design (Bill)
- Cathode frame prototyping
- Full-scale prototype tests
- cosmic test results (Beni) FDC Log Book, pages 505
- oxygen contamination measurements Beni's scheme
- Other
Minutes
Participants: Eugene, Bill, Fernando, Glenn, Roger, Casey, Beni, Simon, and Lubomir.