Difference between revisions of "Minutes-7-8-2010"
From GlueXWiki
Line 5: | Line 5: | ||
# Production | # Production | ||
#* 727 B.C. status | #* 727 B.C. status | ||
− | #* wire frame production planning | + | #* wire frame [http://www.jlab.org/Hall-D/detector/fdc/general/fdc_production_fasttrack.JPG production planning ] |
#* wire stringing design | #* wire stringing design | ||
#* rohacell ring production | #* rohacell ring production |
Revision as of 11:32, 8 July 2010
July 8, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- wire frame production planning
- wire stringing design
- rohacell ring production
- Electronics: update (Fernando)
- Cathode redesign: finalizing (Roger)
- Full-scale prototype tests
- cosmic test results (Beni) FDC Log Book, pages 504
- oxygen contamination measurements Beni's scheme
- Other