# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) | ||
# Full-scale prototype test results | # Full-scale prototype test results | ||
− | #* tests with fADC125 (Lubomir) | + | #* tests with fADC125 [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] [http://www.jlab.org/Hall-D/detector/fdc/pictures/fADC125_one_event.pdf one event using fADC125 ] (Lubomir) |
#* cosmics tests (Beni) | #* cosmics tests (Beni) | ||
# Other | # Other | ||
− | + | ||
= Minutes = | = Minutes = | ||
− | Participants: Bill, Casey, | + | Participants: Bill, Mark, Casey, Simon, Eugene, Glenn, Fernando, Beni, Lubomir, and Gerard on the phone |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
== Production == | == Production == | ||
− | - | + | - Bill has given updated drawings with our requirements for the off-site space to Ron Lauze. Ron will work on the infrastructure of that building. |
− | - | + | - Bill has reviewed the production planing document linked above. There were several questions regarding the timing of the |
+ | <!-- | ||
== Electronics == | == Electronics == | ||
Revision as of 16:50, 20 May 2010
May 20, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- Electronics
- fADC125 status (Fernando)
- PCB status (Kim, Fernando)
- grounding (Fernando, Lubomir)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype test results
- tests with fADC125 FDC Log Book one event using fADC125 (Lubomir)
- cosmics tests (Beni)
- Other
Minutes
Participants: Bill, Mark, Casey, Simon, Eugene, Glenn, Fernando, Beni, Lubomir, and Gerard on the phone
Production
- Bill has given updated drawings with our requirements for the off-site space to Ron Lauze. Ron will work on the infrastructure of that building.
- Bill has reviewed the production planing document linked above. There were several questions regarding the timing of the