Difference between revisions of "May 20, 2010 Readout"
From GlueXWiki
(→Documents to Review) |
|||
Line 17: | Line 17: | ||
= Documents to Review= | = Documents to Review= | ||
− | |||
* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1474 GlueX-doc-1474] BCAL Dynamic Range from the Simulation with FLUKA | * [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1474 GlueX-doc-1474] BCAL Dynamic Range from the Simulation with FLUKA | ||
Revision as of 14:26, 6 May 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
- Start a bulleted list of testing for the SiPMs (Serguey).
- Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). Add min and max for both upstream and downstream readouts.
Documents to Review
- GlueX-doc-1474 BCAL Dynamic Range from the Simulation with FLUKA
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- USM MOU/contract update (Elton)
- Simulation runs
- Geometry
- SiPM Radiation Hardness Test (Yi)
- SiPM - Testing Schedules
- Light guides
Minutes
Attending: