Line 8: | Line 8: | ||
#* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian) | #* Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian) | ||
# Updates on: | # Updates on: | ||
− | #* | + | #* Electronics: finalizing the PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right], [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left], [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] (Fernando, Kim) |
#* Cathode redesign (Bill, Roger) | #* Cathode redesign (Bill, Roger) | ||
− | #* | + | #* Tests of the new frame prototype (Lubomir) |
# Full scale prototype | # Full scale prototype | ||
− | #* | + | #* Three-layer HV tests (Beni) |
− | #* | + | #* Preparations for cosmics tests |
# Other | # Other | ||
Revision as of 17:59, 14 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- Wire winding options: IUCF, JLab using UVA equipment, or using SSC winding machine (Lubomir, Bill, Brian)
- Updates on:
- Electronics: finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right (Fernando, Kim)
- Cathode redesign (Bill, Roger)
- Tests of the new frame prototype (Lubomir)
- Full scale prototype
- Three-layer HV tests (Beni)
- Preparations for cosmics tests
- Other