# Off-site production space | # Off-site production space | ||
#* status | #* status | ||
− | #* requirements | + | #* requirements [http://www.jlab.org/Hall-D/detector/fdc/general/fdc_production_proposed_foorplan.pdf floor plan] |
# Electronics (Fernando) | # Electronics (Fernando) | ||
#* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] | #* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] |
Revision as of 13:14, 8 April 2010
April 8, 2010 FDC meeting
Tentative Agenda
- Off-site production space
- status
- requirements floor plan
- Electronics (Fernando)
- finalizing PCB design Readout_left HV_right HV_left Readout_right
- cable procurement
- Cathode redesign redesign, central hole (Bill, Roger)
- Redesigned frame prototype
- plans for tests
- Full scale prototype (Beni)
- two-layer HV tests
- third layer status
- preparation for cosmics tests
- Other