Line 20: | Line 20: | ||
#* some results from the tests with Sr source [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] (Lubomir) | #* some results from the tests with Sr source [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book] (Lubomir) | ||
# Cathode frame redesign | # Cathode frame redesign | ||
− | #* MC studies of the beam hole size (Alex) | + | #* [http://www.jlab.org/~somov/fdc_rate.pdf MC studies of the beam hole size] (Alex) |
# Other | # Other | ||
#* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ wire sample reports ] | #* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ wire sample reports ] | ||
#* updated FDC naming convention [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_NamingConvention.pdf naming convention] | #* updated FDC naming convention [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_NamingConvention.pdf naming convention] |
Revision as of 14:04, 25 March 2010
March 25, 2010 FDC meeting
Tentative Agenda
- Production space update off-site floor plans
- Electronics
- threshold variations in the discriminator section of the pre-amps (Fernando) Fernando's pdf
- PCB status
- Frame modification
- cathode sandwich and wire frame
- ground plane tests (leakage, tension)
- Wire winding update
- IUCF phase 3 contract phase 3 budget
- plans for wire winding upgrades in the summer
- tension specs
- Full scale prototype tests
- lessons learned from the HV tests cope-shots1, cope-shots2, HV issues
- plans for tests in the tend
- some results from the tests with Sr source FDC Log Book (Lubomir)
- Cathode frame redesign
- Other
- wire sample measurements wire sample reports
- updated FDC naming convention naming convention