− | ** Area | + | ** Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts. |
** May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas). | ** May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas). | ||
− | ** | + | ** May need extra space for large power supply (6' x 5') and to avoid placing controls racks in large B field. |
− | ** Must maintain clear areas around racks | + | ** Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways. |
− | ** Platform is 172" x 160". | + | ** Platform is 172" x 160", cryo can will sit on top. |
− | ** | + | ** Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons). |
− | ** Need to | + | ** Need come-alongs and anchors to move yokes and coils along rails. |
* To Do: | * To Do: | ||
Line 20: | Line 20: | ||
** Arrange for piping designer - George | ** Arrange for piping designer - George | ||
** Investigate sensitivity of electronic equipment to B fields - Elliott | ** Investigate sensitivity of electronic equipment to B fields - Elliott | ||
+ | ** Dsign piping to vent N2 - ? | ||
+ | ** Design warm and cold He supply/return systems, and LN2 supply system - ? | ||
Line 25: | Line 27: | ||
** Verify we can borrow heat exchanger from Hall A - George | ** Verify we can borrow heat exchanger from Hall A - George | ||
** Order warm He and N2 piping - ? | ** Order warm He and N2 piping - ? | ||
+ | ** Retrieve rails from IU - ? | ||
Revision as of 13:56, 18 June 2009
Notes and to-do lists for the solenoid coil tests this summer and fall.
Test Area
- Notes:
- Area in the test lab is 20'6" x 25'9", currently filled with coils and coil parts.
- May be able to get space in adjacent area (QWeak construction and SRF cavity storage areas).
- May need extra space for large power supply (6' x 5') and to avoid placing controls racks in large B field.
- Must maintain clear areas around racks and power supply, and cannot block pedestrian walkways.
- Platform is 172" x 160", cryo can will sit on top.
- Area has two cranes, but need both (and spreader bar) to lift heaviest yoke (45 tons).
- Need come-alongs and anchors to move yokes and coils along rails.
- To Do:
- Look into getting space in adjacent areas - George
- Look into possibility of locating computer in control room - Elliott
- Distribute Floyd's B field map for single coil, no cladding - George
- Determine location of all components - Wayne
- Arrange for piping designer - George
- Investigate sensitivity of electronic equipment to B fields - Elliott
- Dsign piping to vent N2 - ?
- Design warm and cold He supply/return systems, and LN2 supply system - ?
- Verify we have all cryo transfer lines and U-tubes - Mark S
- Verify we can borrow heat exchanger from Hall A - George
- Order warm He and N2 piping - ?
- Retrieve rails from IU - ?
Infrastructure
- Notes:
- To Do:
Components
- Notes:
- To Do:
Staging
- Notes:
- To Do:
Reviews
- Notes:
- Micro-review of PLC vendor choice completed, waiting for report.
- To Do:
- Write thank-you letter to Jonathan Creel and Omar Garza for participating in PLC vendor review.