+ | Attendees: Yuyao, Sasha, Hakob, Vlad, Igal, Bill, Zisis, Mac, Drew, S.T. | ||
+ | * Final detector checkout completed | ||
+ | ** Timing delays of reference PMTs relative to LEDs set | ||
+ | ** No new issues with dividers found | ||
+ | * While solenoid was ramping up, studied how well ECAL magnetic shielding was working by looking at changes in amplitude using LMS data | ||
+ | ** Found maximum relative difference between full field at 1350 amp and low field (not quite at 0 amps) ~3% | ||
+ | *** Deviations not symmetric about the beam pipe -- most differences seen in south top quadrant of ECAL | ||
+ | **** GEMTRD prototype is below south bottom quadrant | ||
+ | **** Impact of DIRC boxes? | ||
+ | ** Looked at deviations as a function of field for several channels | ||
+ | * Setup of 5x5 PWO + 5x5 LG prototype to be installed on PS arm in hall continues | ||
+ | ** Need table rated for weight of COMCAL box plus crystals and blocks | ||
+ | ** Need 2 more flash-ADCs | ||
+ | ** Base of COMCAL box extended to accommodate all LG blocks | ||
+ | ** Using resistive bases for LG borrowed from Hall A | ||
+ | *** Good signal quality but large spread in amplitudes | ||
+ | *** Dividers use connector that needs to be converted to SHV, patch panel needed | ||
+ | ** Hakob checkout out all LG modules using dark box | ||
+ | ** Tensioning plates to push LG PMTs toward cookies being added | ||
+ | ** Added block to align lead tungstate crystals with LG blocks | ||
+ | ** Ready to start assembly | ||
+ | ** PS arm occupied for first ~1.5 months | ||
+ | * S.T. on FCAL/ECAL shower reorganization |
Latest revision as of 09:58, 7 April 2025
Connection
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Detector checkout Sasha, Hakob, Vlad
- Tuning timing delays for the ECAL alpha-source trigger [1]
- Testing ECAL magnetic shielding
- List of LED runs taken during the magnet ramp-up [2]
- List of runs
- LMS amplitudes
Restoring PS test setup [3]
- Fabricating prototype consisting of 5x5 PWO4 and 5x5 LG modules (PS test setup)
- ECAL modules exist, have been testes using an LED
- LG modules will be instrumented with the resistive dividers (borrowed from Hall D)
- all dividers were testes
- modified PMT coupling to the LG block, use G10 tensioning plate to push the PMT towards the module
- testing LG PMTs (FEU-84)
- The prototype will be places inside the CCAL box
- modified the cooling plate to accommodate all modules
Monitoring
Calibrations
Minutes
Attendees: Yuyao, Sasha, Hakob, Vlad, Igal, Bill, Zisis, Mac, Drew, S.T.
- Final detector checkout completed
- Timing delays of reference PMTs relative to LEDs set
- No new issues with dividers found
- While solenoid was ramping up, studied how well ECAL magnetic shielding was working by looking at changes in amplitude using LMS data
- Found maximum relative difference between full field at 1350 amp and low field (not quite at 0 amps) ~3%
- Deviations not symmetric about the beam pipe -- most differences seen in south top quadrant of ECAL
- GEMTRD prototype is below south bottom quadrant
- Impact of DIRC boxes?
- Deviations not symmetric about the beam pipe -- most differences seen in south top quadrant of ECAL
- Looked at deviations as a function of field for several channels
- Found maximum relative difference between full field at 1350 amp and low field (not quite at 0 amps) ~3%
- Setup of 5x5 PWO + 5x5 LG prototype to be installed on PS arm in hall continues
- Need table rated for weight of COMCAL box plus crystals and blocks
- Need 2 more flash-ADCs
- Base of COMCAL box extended to accommodate all LG blocks
- Using resistive bases for LG borrowed from Hall A
- Good signal quality but large spread in amplitudes
- Dividers use connector that needs to be converted to SHV, patch panel needed
- Hakob checkout out all LG modules using dark box
- Tensioning plates to push LG PMTs toward cookies being added
- Added block to align lead tungstate crystals with LG blocks
- Ready to start assembly
- PS arm occupied for first ~1.5 months
- S.T. on FCAL/ECAL shower reorganization