Difference between revisions of "FCAL2 Readiness Review"

From GlueXWiki
Jump to: navigation, search
(ERR Agenda)
(ERR Agenda)
Line 31: Line 31:
 
10:15-10:30 Coffee break
 
10:15-10:30 Coffee break
  
10:30-11:00: "Engineering design of the detector frame and cooling system" (15+15)   T. Whitlatch  (addressing charge 2)
+
10:30-11:00: [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6730 Engineering design of the detector frame and cooling system] (15+15) T. Whitlatch  (addressing charge 2)
  
 
11:00-11:30: "Integration of the ECAL into the GlueX framework" (15+15) A. Somov      (addressing charge 4)
 
11:00-11:30: "Integration of the ECAL into the GlueX framework" (15+15) A. Somov      (addressing charge 4)

Revision as of 12:32, 11 February 2025

Location

Date: February 14, 2025

Time: 9 am EST

Room: L102 (CEBAF center)


Experiments: E12-12-002 and E12-12-002A


Charge [1]


Committee members: Stepan Stepanyan (chair), Sergey Boyarinov (DAQ/Trigger), Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan

ERR Agenda

8:45-9:00: Executive session

9:00-9:45: Status of the ECAL commissioning (25+20) A. Somov (addressing charges 1, 2, 3, 5, and 6)

9:45-10:15: "Status of the FCAL part" (15+15) M. Albrecht (addressing charges 1, 3, and 6)

10:15-10:30 Coffee break

10:30-11:00: Engineering design of the detector frame and cooling system (15+15) T. Whitlatch (addressing charge 2)

11:00-11:30: "Integration of the ECAL into the GlueX framework" (15+15) A. Somov (addressing charge 4)

11:30-12:00: "Shower reconstruction and FCAL2 detector calibration" (15+15) S. Taylor (addressing charge 5)

12:00-12:30 (tentative) : Executive session

12:30: (tentative) Closeout

Documentation

  • JLab-PTW-5236 Maintenance of the GlueX trigger system [2][3]
  • JLab-PTW-5236 Maintenance of the Hall D ECAL [4][5]

Supplementary Material