Difference between revisions of "JEF meeting, January 10, 2025"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Connection = Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information C...")
 
Line 15: Line 15:
  
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 
''' [https://halldweb.jlab.org/wiki/index.php/ECAL_Commissioning ECAL commissioning]''' -- Sasha, All
 +
  
 
'''Calibrations'''
 
'''Calibrations'''
  
 +
*Gain calibration
 +
*Low-level timing
 +
* Timing with respect to other detectors
 
'''Analysis/Simulation'''
 
'''Analysis/Simulation'''

Revision as of 10:40, 9 January 2025

Connection

Meeting time and location:

Agenda

Preparation of parts for ECAL -- Sasha

Installation of the FCAL2 detector & integration to GlueX -- Sasha, All

Preparing for the run -- Sasha

Restoring PS test setup [1]

ECAL commissioning -- Sasha, All


Calibrations

  • Gain calibration
  • Low-level timing
  • Timing with respect to other detectors

Analysis/Simulation