Difference between revisions of "Apr 16, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 33: | Line 33: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | # Announcements | ||
+ | # Calibration (Athens) | ||
+ | #* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1236 LED layout] | ||
+ | # FCAL Update | ||
+ | # Simulations | ||
+ | # BCAL Update | ||
+ | ## Preparations for construction | ||
+ | ## Cooling of BCAL Readout | ||
+ | ##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 Sensitivity to voltage temperature] (Elton) | ||
+ | ## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1235 Update on Hamamatsu and Sensl Sipms] PPT: [http://www.jlab.org/~zihlmann/SiPM_MPPC_update.ppt] (Carl) | ||
+ | # Agenda Collab. Meeting [http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX-Collaboration-May-2009] | ||
+ | # Review of Action Items |
Revision as of 15:45, 16 April 2009
Teleconference Time: 11:00 a.m. EST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
- Bfield calculations for new FCAL mag shield design to evaluate impact on pmt performance.
Documents to Review
Tentative Agenda
- Announcements
- Calibration (Athens)
- FCAL Update
- Simulations
- BCAL Update
- Preparations for construction
- Cooling of BCAL Readout
- Update on Hamamatsu and Sensl Sipms PPT: [1] (Carl)
- Agenda Collab. Meeting [2]
- Review of Action Items
Minutes
- Announcements
- Calibration (Athens)
- FCAL Update
- Simulations
- BCAL Update
- Preparations for construction
- Cooling of BCAL Readout
- Update on Hamamatsu and Sensl Sipms PPT: [3] (Carl)
- Agenda Collab. Meeting [4]
- Review of Action Items