Difference between revisions of "Controls Meeting 30-Nov-2023"
From GlueXWiki
(Created page with "* Announcements * Solenoid status ** PXI spare controller tests (Brian) * ECAL chiller status (Scot, Bobby) * ECAL and FCAL sensor installations (Bobby) * ECAL and FCAL vol...") |
|||
Line 5: | Line 5: | ||
* ECAL chiller status (Scot, Bobby) | * ECAL chiller status (Scot, Bobby) | ||
* ECAL and FCAL sensor installations (Bobby) | * ECAL and FCAL sensor installations (Bobby) | ||
+ | * Status of the power for the ECAL racks (Tim, Scot) | ||
* ECAL and FCAL voltage controls (Hovanes) | * ECAL and FCAL voltage controls (Hovanes) | ||
* ECAL HV interlocks (Bobby) | * ECAL HV interlocks (Bobby) |
Latest revision as of 10:53, 30 November 2023
- Announcements
- Solenoid status
- PXI spare controller tests (Brian)
- ECAL chiller status (Scot, Bobby)
- ECAL and FCAL sensor installations (Bobby)
- Status of the power for the ECAL racks (Tim, Scot)
- ECAL and FCAL voltage controls (Hovanes)
- ECAL HV interlocks (Bobby)
- New NMR probe and chassis (Scot)
- Other items
Time/Location
10:00am Thursday 30-November-2023