Difference between revisions of "Controls Meeting 28-Sep-2023"
From GlueXWiki
Line 3: | Line 3: | ||
** PXI spare controller procurement (Brian) | ** PXI spare controller procurement (Brian) | ||
* Atmospheric pressure sensors (Bobby) | * Atmospheric pressure sensors (Bobby) | ||
− | * FCAL-2 chiller | + | * FCAL-2 chiller status (Scot, Bobby) |
* FCAL-2 sensors (Bobby) | * FCAL-2 sensors (Bobby) | ||
* FCAL-2 voltage controls (Hovanes) | * FCAL-2 voltage controls (Hovanes) | ||
− | |||
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby) | * Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby) | ||
* New NMR probe (Scot) | * New NMR probe (Scot) | ||
+ | * CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby) | ||
* Switch in the tagger hall (Hovanes) | * Switch in the tagger hall (Hovanes) | ||
* Other items | * Other items |
Revision as of 14:45, 26 September 2023
- Announcements
- Solenoid status
- PXI spare controller procurement (Brian)
- Atmospheric pressure sensors (Bobby)
- FCAL-2 chiller status (Scot, Bobby)
- FCAL-2 sensors (Bobby)
- FCAL-2 voltage controls (Hovanes)
- Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
- New NMR probe (Scot)
- CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
- Switch in the tagger hall (Hovanes)
- Other items
Time/Location
10:00am Thursday 28-September-2023