Difference between revisions of "Mar 5, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 41: | Line 41: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | # Announcements | ||
+ | # FCAL Update | ||
+ | ## MOU | ||
+ | ## rad-hard glass insert | ||
+ | ## magnetic shield tests ([[Media:Feu84-3 field sensitivity.pdf |Field Sensitivity Plots]]) | ||
+ | # Simulations | ||
+ | # BCAL Update | ||
+ | ## Preparations for construction | ||
+ | ## Fiber measurements (Beni) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1225 GlueX Doc 1225] | ||
+ | ## Acceptance date for fibers (fiber arrival at JLab on Feb 13). | ||
+ | # BCAL Readout | ||
+ | ## SiPM and cooling [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton) | ||
+ | ## FM pmts (USM?) | ||
+ | ## APD option (Eugene) | ||
+ | # Review of Action Items |
Revision as of 11:07, 6 March 2009
Teleconference Time: 11:00 EST/10:00 CST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Feb 19 meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
Documents to Review
- Fibers
- APDs
Tentative Agenda
- Announcements
- FCAL Update
- MOU
- rad-hard glass insert
- magnetic shield tests (Field Sensitivity Plots)
- Simulations
- BCAL Update
- Preparations for construction
- Fiber measurements (Beni) GlueX Doc 1225
- Acceptance date for fibers (fiber arrival at JLab on Feb 13).
- BCAL Readout
- SiPM and cooling GlueX-doc-1214(Elton)
- FM pmts (USM?)
- APD option (Eugene)
- Review of Action Items
Minutes
- Announcements
- FCAL Update
- MOU
- rad-hard glass insert
- magnetic shield tests (Field Sensitivity Plots)
- Simulations
- BCAL Update
- Preparations for construction
- Fiber measurements (Beni) GlueX Doc 1225
- Acceptance date for fibers (fiber arrival at JLab on Feb 13).
- BCAL Readout
- SiPM and cooling GlueX-doc-1214(Elton)
- FM pmts (USM?)
- APD option (Eugene)
- Review of Action Items