Difference between revisions of "Mar 5, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 28: | Line 28: | ||
## MOU | ## MOU | ||
## rad-hard glass insert | ## rad-hard glass insert | ||
− | ## magnetic shield tests | + | ## magnetic shield tests ([[Media:Feu84-3 field sensitivity.pdf |Field Sensitivity Plots]]) |
# Simulations | # Simulations | ||
# BCAL Update | # BCAL Update |
Revision as of 11:40, 5 March 2009
Teleconference Time: 11:00 EST/10:00 CST
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Feb 19 meeting
- Resolution studies (Blake)
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
- Review options for import/export to Chile (loans, donations, transfers, etc.)
Documents to Review
- Fibers
- APDs
Tentative Agenda
- Announcements
- FCAL Update
- MOU
- rad-hard glass insert
- magnetic shield tests (Field Sensitivity Plots)
- Simulations
- BCAL Update
- Preparations for construction
- Fiber measurements (Beni) GlueX Doc 1225
- Acceptance date for fibers (fiber arrival at JLab on Feb 13).
- BCAL Readout
- SiPM and cooling GlueX-doc-1214(Elton)
- FM pmts (USM?)
- APD option (Eugene)
- Review of Action Items