Difference between revisions of "Mini BCAL in Hall-D"
From GlueXWiki
(→Module Assignment) |
(→Wrapping the BCAL) |
||
Line 44: | Line 44: | ||
== Wrapping the BCAL == | == Wrapping the BCAL == | ||
+ | The mini BCAL was wrapped in black Tedlar after mounting the SiPM modules and connecting the LEMO output cables. | ||
+ | After wrapping the BCAL was covered using a black cloth to make it light tight | ||
+ | [[File:MiniBCAL-Tedlar-Wrapped.jpeg|400px|thumb|left|mini BCAL wrapped in Black tedlar]] [[File:MiniBCAL-Cloth-Wrapping.jpeg|400px|thumb|center|mini BCAL after wrapping in Black cloth]] | ||
+ | |||
+ | <br> | ||
+ | <br> | ||
== DAQ Crate assignment == | == DAQ Crate assignment == |
Revision as of 17:10, 6 March 2023
Contents
mini BCAL Setup at Hall-D
The mini BCAL was set up on the test bench. Downstream is defined as the North end and the Upstream is defined as the South End
Cable stretching
The North and south end cables were grouped together and stretched across cables crates over to the DAQ.
Module Assignment
Module Name | HV/LV Input Channel | Direction | After Cabling |
---|---|---|---|
Module 49 Upstream | J7 | South | |
Module 49 Downstream |
J8 | North |
Wrapping the BCAL
The mini BCAL was wrapped in black Tedlar after mounting the SiPM modules and connecting the LEMO output cables. After wrapping the BCAL was covered using a black cloth to make it light tight