Difference between revisions of "Controls Meeting 23-Feb-2023"
From GlueXWiki
Line 2: | Line 2: | ||
* Solenoid status | * Solenoid status | ||
** PXI spare procurement (Brian) | ** PXI spare procurement (Brian) | ||
+ | ** Cryo-monitor, Supply N2 pressure, and N2 pressure removed from the interlock screen (Hovanes) | ||
* [https://logbooks.jlab.org/entry/4136666 BCAL chiller swap] (Hovanes) | * [https://logbooks.jlab.org/entry/4136666 BCAL chiller swap] (Hovanes) |
Revision as of 17:15, 22 February 2023
- Announcements
- Solenoid status
- PXI spare procurement (Brian)
- Cryo-monitor, Supply N2 pressure, and N2 pressure removed from the interlock screen (Hovanes)
- BCAL chiller swap (Hovanes)
- CAEN HV crate reset (Bobby)
- Atmospheric pressure sensor (Bobby, Scot)
- Tagger magnet NMR box (Tim)
- FCAL2 Controls Media:FCAL2_controls.pdf
- Other items
Time/Location
10:00am Thursday 23-February-2023