Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"
From GlueXWiki
(→Shift Summaries) |
(→Shift Summaries) |
||
Line 37: | Line 37: | ||
*[https://logbooks.jlab.org/entry/4090341 Thu 24 Nov day] | *[https://logbooks.jlab.org/entry/4090341 Thu 24 Nov day] | ||
*[https://logbooks.jlab.org/entry/4090523 Thu 24 Nov swing] [https://logbooks.jlab.org/entry/4090524 swing 2] | *[https://logbooks.jlab.org/entry/4090523 Thu 24 Nov swing] [https://logbooks.jlab.org/entry/4090524 swing 2] | ||
− | + | *[https://logbooks.jlab.org/entry/4090646 Thu 24 Nov owl] [https://logbooks.jlab.org/entry/4090687 owl 2] | |
*[https://logbooks.jlab.org/entry/4090766 Fri 25 Nov early riser] | *[https://logbooks.jlab.org/entry/4090766 Fri 25 Nov early riser] |
Revision as of 09:53, 25 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Our next planned meeting is on Monday Nov 28
The plan
- Continue production running at 200nA with a full target until further notice (after the weekend).
Achievements
- Production running with full target, 3.8B triggers as of Thursday 8pm
- Filled the target on Wednesday morning after approximately 2B triggers with empty target.
- Raw mode cosmics run 111571 (Beni)
- FCAL base changed (Malte)
- Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
Issues
- One Ar cylinder is empty
- Reconstructed Beam Energy monitoring plot discrepancy in recent runs (Drew)
Drama
- Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.