Difference between revisions of "Run Planning Meeting Notes, Novemver 17 - Novemver 23, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Issues/Reports) |
||
Line 24: | Line 24: | ||
=== Issues/Reports === | === Issues/Reports === | ||
− | + | * [https://logbooks.jlab.org/entry/4085657 Non regular beam energy] (Keigo/Victor) | |
* [https://logbooks.jlab.org/entry/4084969 FCAL base lock] | * [https://logbooks.jlab.org/entry/4084969 FCAL base lock] | ||
* [https://logbooks.jlab.org/entry/4085126 CDC IA was not turned on after the target was filled] (Ellie/Thomas) | * [https://logbooks.jlab.org/entry/4085126 CDC IA was not turned on after the target was filled] (Ellie/Thomas) |
Revision as of 08:32, 17 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, November 17
Past 24 hours
- 2.6B collected (111460-present)
- 2hrs lost because of DAQ issue
Shift Summary
Issues/Reports
- Non regular beam energy (Keigo/Victor)
- FCAL base lock
- CDC IA was not turned on after the target was filled (Ellie/Thomas)
- DAQ issue (Sergey/Ellie/Thomas)
- 3.68B collected since the start of this Full target cycle (111456-present)
Plan
- Take Full target data until 12(?)B triggers reached
- Acc. White Board, no maintenance scheduled for next week
- Priority to Hall C until 24/11
- Priority to Hall A 25/11 to ??/??