Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Monday, November 7) |
|||
Line 11: | Line 11: | ||
=Monday, November 7= | =Monday, November 7= | ||
=== Past 72 hours === | === Past 72 hours === | ||
− | * Friday. We took production data in empty target all day until Saturday morning | + | * Friday. We took production data in empty target all day until Saturday morning. Smooth beam |
− | * Saturday | + | * Saturday: ( in general the beam conditions have not been ideal) |
− | ** | + | ** Total accumulated events for all this days doing empty target ~2.5B |
+ | ** Day: ~10 am we started filling the target while Sasha | ||
* Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access) | * Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access) | ||
=== Shift Summary === | === Shift Summary === | ||
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4076528 Day Nov 4 ] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4076760 Swing Nov 4] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4076892 Owl Nov4/5] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4076991 Early riser Nov 5] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4077095 Day Nov 5 ] |
+ | * [https://logbooks.jlab.org/entry/4077240 Swing Nov 5] | ||
+ | * [https://logbooks.jlab.org/entry/4077403 Owl Nov5/6 (Luckiest Shift crew of the year!)] | ||
+ | * [https://logbooks.jlab.org/entry/4077533 Early riser Nov 6] | ||
+ | * [https://logbooks.jlab.org/entry/4077654 Day Nov 6 ] | ||
+ | * [https://logbooks.jlab.org/entry/4077771 Swing Nov 6] | ||
+ | * [https://logbooks.jlab.org/entry/4077881 Owl Nov6/7] | ||
+ | * [https://logbooks.jlab.org/entry/4077974 Early riser Nov 7] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | === Issues/Reports === | ||
+ | * Shift Crew repotred: Fill the alcohol bubblers | ||
+ | |||
=== Plan === | === Plan === | ||
− | * Continue with | + | * Continue with Full target production. |
− | + | ||
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | * After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | ||
Revision as of 08:31, 7 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Monday, November 7
Past 72 hours
- Friday. We took production data in empty target all day until Saturday morning. Smooth beam
- Saturday: ( in general the beam conditions have not been ideal)
- Total accumulated events for all this days doing empty target ~2.5B
- Day: ~10 am we started filling the target while Sasha
- Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
Shift Summary
- Day Nov 4
- Swing Nov 4
- Owl Nov4/5
- Early riser Nov 5
- Day Nov 5
- Swing Nov 5
- Owl Nov5/6 (Luckiest Shift crew of the year!)
- Early riser Nov 6
- Day Nov 6
- Swing Nov 6
- Owl Nov6/7
- Early riser Nov 7
Issues/Reports
- Shift Crew repotred: Fill the alcohol bubblers
Plan
- Continue with Full target production.
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
Friday, November 4
Past 24 hours
- Emptied the target at 9 am. No problems on that
- Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
Shift Summary
Issues/Reports
- Alarm in one of the magnets (Beni)
Cycling TAG5C (Daniel Moser)
- CDC EPICS showing diconnected (Arshak/Boris)
Hard reboot worked (Arshak)
Plan
- Continue with empty target production.
- (Note): Hall B plans to change to a 1/2 wave plate at some point Today.
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
Thursday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. [1] [2]
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
- FCAL voltage issue and bases replacement (Malte)
- Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??)
Plan
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)