Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Issues/Reports) |
(→Plan) |
||
Line 26: | Line 26: | ||
=== Plan === | === Plan === | ||
− | + | ||
* 9:30 am Empty target, then start production | * 9:30 am Empty target, then start production | ||
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | * After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) |
Revision as of 08:27, 3 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Wednesday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. https://logbooks.jlab.org/entry/4075542
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
Plan
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)