Difference between revisions of "Run Planning Meeting Notes, October 26 - November 2, 2022"
From GlueXWiki
(→Monday, October 31) |
|||
Line 13: | Line 13: | ||
=== Past 72 hours === | === Past 72 hours === | ||
− | * Friday afternoon TOF HV module failed, replaced (Beni | + | * Friday afternoon TOF HV module [https://logbooks.jlab.org/entry/4071865 failed], replaced (Beni/Sasha) |
− | * Beam returned early Saturday morning | + | * Beam returned early Saturday morning and was smooth most of the weekend |
=== Shift Summary === | === Shift Summary === | ||
+ | * [https://logbooks.jlab.org/entry/4071702 Day Oct 28] | ||
+ | * [https://logbooks.jlab.org/entry/4071996 Swing Oct 28] | ||
+ | * [https://logbooks.jlab.org/entry/4072081 Owl Oct 28/29] | ||
+ | * [https://logbooks.jlab.org/entry/4072325 Early Riser Oct 29] | ||
+ | * [https://logbooks.jlab.org/entry/4072561 Day Oct 29] | ||
+ | * [https://logbooks.jlab.org/entry/4072741 Swing Oct 29] | ||
+ | * [https://logbooks.jlab.org/entry/4072986 Owl Oct 29/30] | ||
+ | * [https://logbooks.jlab.org/entry/4073195 Early Riser Oct 30] | ||
+ | * [https://logbooks.jlab.org/entry/4073408 Day Oct 29] | ||
+ | * [https://logbooks.jlab.org/entry/4073568 Swing Oct 29] | ||
+ | * [https://logbooks.jlab.org/entry/4073694 Owl Oct 29/30] | ||
+ | * [https://logbooks.jlab.org/entry/4073866 Early Riser Oct 30] | ||
=== Issues/Reports === | === Issues/Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4073434 FDC translation table needs update for PrimEx] (Justin/Lubomir) | ||
=== Plan === | === Plan === | ||
− | * Production running on full target | + | * Production running on full target. When to change to empty? |
− | * Accelerator: Hall A pass change | + | * [https://logbooks.jlab.org/entry/4073876 Request for raw mode running with beam (none for PrimEx yet)] (Lubomir) |
+ | * Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | ||
+ | * Accelerator: Hall A pass change and maintenance day (access) on Wednesday this week | ||
=Friday, October 28= | =Friday, October 28= | ||
Line 43: | Line 58: | ||
=== Plan === | === Plan === | ||
* Recover from accelerator power supply issue by "early afternoon" | * Recover from accelerator power supply issue by "early afternoon" | ||
− | * | + | * Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) |
* Production data with full target | * Production data with full target | ||
Line 69: | Line 84: | ||
** Fill target before beam returns for production data | ** Fill target before beam returns for production data | ||
* Harp scan after beam is restored, more than a week since the last one (Alexandre) | * Harp scan after beam is restored, more than a week since the last one (Alexandre) | ||
− | * | + | * Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) |
* Production data with full target | * Production data with full target |
Revision as of 08:11, 31 October 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Monday, October 31
Happy Halloween!
Past 72 hours
- Friday afternoon TOF HV module failed, replaced (Beni/Sasha)
- Beam returned early Saturday morning and was smooth most of the weekend
Shift Summary
- Day Oct 28
- Swing Oct 28
- Owl Oct 28/29
- Early Riser Oct 29
- Day Oct 29
- Swing Oct 29
- Owl Oct 29/30
- Early Riser Oct 30
- Day Oct 29
- Swing Oct 29
- Owl Oct 29/30
- Early Riser Oct 30
Issues/Reports
- FDC translation table needs update for PrimEx (Justin/Lubomir)
Plan
- Production running on full target. When to change to empty?
- Request for raw mode running with beam (none for PrimEx yet) (Lubomir)
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Accelerator: Hall A pass change and maintenance day (access) on Wednesday this week
Friday, October 28
Past 24 hours
- Returned from RF recovery around 6 pm, postponed CompCal calibration run to Friday
- Harp scans performed when beam restored
- Production running until midnight: "smoking gun" for burnt RF power supply
- FDC chiller interlock
Shift Summary
Issues/Reports
Plan
- Recover from accelerator power supply issue by "early afternoon"
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target
Thursday, October 27
Past 24 hours
- Smooth running with empty target
- 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)
Shift Summary
Issues/Reports
- Avoid long prestarts (Naomi)
- 32 ns shift in tagger crate (no action required)
- Do we still want beam strip charts in the logbook every 2 hours (as noted on white board)?
- SC Dark Current/Rates (Beni)
Plan
- RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
- Expect to start beam recovery around noon
- Fill target before beam returns for production data
- Harp scan after beam is restored, more than a week since the last one (Alexandre)
- Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target