Difference between revisions of "Run Planning Meeting Notes, September 14 - September 20, 2022"
From GlueXWiki
(→Wednesday, September 15) |
(→Thursday, September 15) |
||
Line 12: | Line 12: | ||
=== Past 24 Hours === | === Past 24 Hours === | ||
*[https://logbooks.jlab.org/entry/4041273 Maintenance day] | *[https://logbooks.jlab.org/entry/4041273 Maintenance day] | ||
+ | * Work done in hall: | ||
**FCAL Base replacement (Malte) | **FCAL Base replacement (Malte) | ||
**Installation of setup in PS for GEM-TRD | **Installation of setup in PS for GEM-TRD | ||
Line 31: | Line 32: | ||
* Take data on LHe at 200nA after beam is back | * Take data on LHe at 200nA after beam is back | ||
+ | |||
+ | =Friday, September 16= | ||
+ | === Past 24 hours=== | ||
+ | *Production data at 200nA on the liquid He target. | ||
+ | ***Shift summaries: | ||
+ | |||
+ | === Issues === | ||
+ | |||
+ | === Plan === |
Revision as of 14:32, 14 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Thursday, September 15
Past 24 Hours
- Maintenance day
- Work done in hall:
- FCAL Base replacement (Malte)
- Installation of setup in PS for GEM-TRD
- Beam restoration expected around 8:00PM
- LHe target was filled ~2:30pm
- Time spent on LHe target so far: Full
- Total triggers collected
- Shift summaries:
Issues
Plan
- Take data on LHe at 200nA after beam is back
Friday, September 16
Past 24 hours
- Production data at 200nA on the liquid He target.
- Shift summaries: