Difference between revisions of "PrimEx-eta phase3 FCAL time/energy calibrations"
From GlueXWiki
(→Periods) |
(→Periods) |
||
Line 21: | Line 21: | ||
* period 7: 110641-110672 (He target w/ B-field) | * period 7: 110641-110672 (He target w/ B-field) | ||
* period 8: 110675-110725 (He target w/ B-field/new trigger) | * period 8: 110675-110725 (He target w/ B-field/new trigger) | ||
− | * period 9: 110738-110??? ( | + | * period 9: 110738-110755(Empty He target w/ B-field) |
+ | * period 10: 110771-110??? (He target w/ B-field - start after maintenance day) | ||
== Gain matching calibration plots == | == Gain matching calibration plots == |
Revision as of 22:52, 14 September 2022
Contents
List of changes
These lists are giving the run ranges where the FCAL hardware was not changed.
Monitoring results
What is currently in the default variation
Periods
The periods in BOLD are calibrated i.e. have a pedestal and gain tables. Each period corresponds to constant FCAL and/or experimental conditions.
- period 0: (empty Be target)
- period 1: (empty Be target)
- period 2: 110498-110549 (Be target - B-field ON)
- Period 3: 110553-110583 (Be target - B-field ON, FCAL HV change)
- period 4: 110585-110599 (Be target - B-field ramping down)
- period 5: 110600-110621 (Be target - B-field OFF)
- period 6: 110637-110640 (He target cooling - B-field ramping up, FCAL HV change)
- period 7: 110641-110672 (He target w/ B-field)
- period 8: 110675-110725 (He target w/ B-field/new trigger)
- period 9: 110738-110755(Empty He target w/ B-field)
- period 10: 110771-110??? (He target w/ B-field - start after maintenance day)
Gain matching calibration plots
Checking the FCAL gains
Energy dependence correction monitoring plots
Timing calibration
Bad block map
This map is done for each run number by combining the info collected by analysing the LED and pi0 skims.