** Received 72 PMT housings from Tim a couple of days ago; used practically all of them | ** Received 72 PMT housings from Tim a couple of days ago; used practically all of them | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total 1206 (new milestone)</span> | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1206 (a new milestone)</span> |
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52 |
Revision as of 23:34, 18 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
- currently available/ordered + CCAL: 1593 + (9) (need more spares)
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Preparation of parts[2][3][4]. Remaining components:
- 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
- 200 light guides, will be delivered during a couple of next weeks.
- 400 PMT housings, expect to receive during next two months (bottleneck now)
- Wrapped CRYTUR crystals: 682
- All currently available
- Crystals. [1] Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].
- Module fabrication -- Sasha
- Received 72 PMT housings from Tim a couple of days ago; used practically all of them
- Status of fabrication
- Fabricated modules: Total 1206 (a new milestone)
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Clean room EEL126 [5][6]
- Expect to move to the new lab EEL108 (the same building) [7]
- Work on amending safety docs
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak