Difference between revisions of "Run Planning Meeting Notes, August 18 - August 23, 2022"
From GlueXWiki
(→Thursday August 18) |
(→Readiness Check List) |
||
Line 7: | Line 7: | ||
=== Readiness Check List=== | === Readiness Check List=== | ||
+ | *Solenoid (Eugene/Beni) | ||
+ | **Start the run with magnetic field on | ||
− | + | *Surveys (Tim/Mark) | |
− | + | ** FCAL survey | |
+ | ** TOF syrvey | ||
+ | ** ST syrvey | ||
+ | ** TAGM | ||
+ | ** TAGH | ||
+ | ** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.) | ||
+ | ** Survey CCAL after it's installed in the Hall | ||
+ | *DAQ (Sergei). | ||
+ | ** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change. | ||
+ | *Trigger (Alex S.) | ||
+ | ** Check physics triggers | ||
+ | ** Run CCAL trigger when the detector is installed in the Hall | ||
+ | ** Connect / check CCAL LED and alpha triggers | ||
+ | *Beam line | ||
+ | ** Install He beam pipe between FCAL and CCAL (Tim) | ||
+ | ** Install led shielding wall in front downstream the PS (Tim) | ||
+ | ** Radiator status | ||
+ | *** Check amorphous radiator | ||
+ | ** Tagger hodoscope (A. Somov) | ||
+ | *** Install plates with TAGH counters | ||
+ | *** Install / check repaired TAGH countes | ||
+ | **Tagger microscope (Tim / Richard Jones) | ||
+ | *** Move TAGM to the new location and rotate | ||
+ | **Collimator Motion (Hovanes) | ||
+ | *** Not changed | ||
+ | **Active collimator detectors(Richard Jones/Alexandre Deur) | ||
+ | *** Move active collimator to 5 mm hole | ||
+ | *** Check | ||
+ | **Profiler (Hovanes) | ||
+ | *** Not changed | ||
+ | **Luminosity monitor (Hovanes) | ||
+ | *** Not changed | ||
+ | **Halo monitors | ||
+ | *** Not changed | ||
+ | **PS system (Alex Somov) | ||
+ | *** Not changed | ||
+ | **Beam line magnets (PS magnet sweeping magnet and tagger quads). | ||
+ | *** Change filed of the PS magnet | ||
+ | **Polarimeter (Sebastian Cole/M. Dugger) | ||
+ | *** Optional, not used in PrimEx | ||
+ | ** Targets (Chris/Tim/Alexandre D.) | ||
+ | *** LH4 | ||
+ | *** Be | ||
+ | **TAC (Alex Somov/Hovanes) | ||
+ | *** Use CCAL (TAC can be used as a backup) | ||
+ | **Slow control (Hovanes) | ||
+ | *** Check CCAL | ||
+ | **RF (Sergei) | ||
+ | *** Not changed | ||
+ | **Radiation monitors (Alexandre D.) | ||
+ | *** Not changed | ||
+ | *Detector systems | ||
+ | **ST (Beni) | ||
+ | *** Connect cables, check dark rate | ||
+ | ** FDC (Lubomir) | ||
+ | *** Not changed | ||
+ | ** CDC (Beni) | ||
+ | *** Move CDC1 crate to the nominal position, cable up | ||
+ | *** Check readout | ||
+ | ** BCal (Mark D. / Elton) | ||
+ | *** Not changed | ||
+ | ** FCal (Mark D.) | ||
+ | *** Check / replace bases if needed | ||
+ | ** ComCal (Alex Somov) | ||
+ | ** Check detector controls (Nick) | ||
+ | *** Install CCAL platform | ||
+ | *** Check platform motion | ||
+ | *** Installed detector on the platform | ||
+ | *** Connect cables | ||
+ | *** Connect LMS | ||
+ | *** Check detector | ||
+ | **TOF (Beni) | ||
+ | *** Remove inner acrylic absorber | ||
=== Reports === | === Reports === |
Revision as of 15:38, 17 August 2022
Contents
Thursday August 18
Past 24 hours
Reconfiguration Plan
Readiness Check List
- Solenoid (Eugene/Beni)
- Start the run with magnetic field on
- Surveys (Tim/Mark)
- FCAL survey
- TOF syrvey
- ST syrvey
- TAGM
- TAGH
- Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
- Survey CCAL after it's installed in the Hall
- DAQ (Sergei).
- Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
- Trigger (Alex S.)
- Check physics triggers
- Run CCAL trigger when the detector is installed in the Hall
- Connect / check CCAL LED and alpha triggers
- Beam line
- Install He beam pipe between FCAL and CCAL (Tim)
- Install led shielding wall in front downstream the PS (Tim)
- Radiator status
- Check amorphous radiator
- Tagger hodoscope (A. Somov)
- Install plates with TAGH counters
- Install / check repaired TAGH countes
- Tagger microscope (Tim / Richard Jones)
- Move TAGM to the new location and rotate
- Collimator Motion (Hovanes)
- Not changed
- Active collimator detectors(Richard Jones/Alexandre Deur)
- Move active collimator to 5 mm hole
- Check
- Profiler (Hovanes)
- Not changed
- Luminosity monitor (Hovanes)
- Not changed
- Halo monitors
- Not changed
- PS system (Alex Somov)
- Not changed
- Beam line magnets (PS magnet sweeping magnet and tagger quads).
- Change filed of the PS magnet
- Polarimeter (Sebastian Cole/M. Dugger)
- Optional, not used in PrimEx
- Targets (Chris/Tim/Alexandre D.)
- LH4
- Be
- TAC (Alex Somov/Hovanes)
- Use CCAL (TAC can be used as a backup)
- Slow control (Hovanes)
- Check CCAL
- RF (Sergei)
- Not changed
- Radiation monitors (Alexandre D.)
- Not changed
- Detector systems
- ST (Beni)
- Connect cables, check dark rate
- FDC (Lubomir)
- Not changed
- CDC (Beni)
- Move CDC1 crate to the nominal position, cable up
- Check readout
- BCal (Mark D. / Elton)
- Not changed
- FCal (Mark D.)
- Check / replace bases if needed
- ComCal (Alex Somov)
- Check detector controls (Nick)
- Install CCAL platform
- Check platform motion
- Installed detector on the platform
- Connect cables
- Connect LMS
- Check detector
- TOF (Beni)
- Remove inner acrylic absorber
- ST (Beni)