Thursday August 11
Past 24 hours
- Running on Pb target (30 nA). Another relatively good day: ABU=18.3 h for the day
- Beam down for 3.75 hrs due to afternoon thunderstorms
- Program Deputy summary
Shift Reports
- Day shift summaries (1), (2)
- Swing shift summary (1), (2)
- Owl shift summary
- Early Riser shift summary
Reports
Issues
- Continued: TAGH major link alarm. Description by shift leader. Cannot communicate with crate, but rates are fine -> we decided to run as it is (monitoring TAGH scalars with stripcharts) and have a look latter.
Plans
- Beam off all day for maintenance day
- Hall in controlled access
- Solenoid current to be lowered because of cryowork. Tim seems to be doing this from home as we speak.
- Requested survey of tagger hall for access to reset TAGH crate
- When beam restored run harp scans
- Production on Pb target.
- Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.
Friday August 12
Past 24 hours
- Beam off Thu 630 am - ?? pm for maintenance day
- ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
- ramped down solenoid for cry work (Tim)
- resume prodcution data Friday 3:18 am
Shift Reports
Reports
- Beni reset the TAGH HV crate; it's communicating again ([1])
- Malte changed 2 FCAL bases ([2], [3])
- The filter material (Molecular Sieve) Assy. for the Cryomech cold compressor in Hall-D has been completed by target group
- Tim also reports that compressor swap is complete; not sure whether that refers to the target group's work?
- Beam delivary after maintenance day delayed until ??? due to a leak in magnet LCW hose in NL.
Issues
Plans
- Continue with prodcution data on Pb through the weekend.
- Plan for TAC run on Monday, when Hall C installs their aerogel.
Monday August 15
Plan for Monday: Hall C will turn off beam at 7 am. Access to hall at 7 am to move target to empty position. Sasha will try to make it in by 7:30 am to start TAC measurement.
Friday: Day through Owl
- at 7:45 am meeting Hall B complained about bleedthrough from C; optimizing the machine led to considerable downtime during the day.
- at 12 pm MCC starts tuning
- Otherwise running on Pb target (30 nA)
Shift | ABU | BANU | BNA | ER |
---|---|---|---|---|
8/12 Day | 4.24 h | 3.3 min | 3.70 h | 8 h |
8/12 Swing | 2.97 h | 1.40 h | 3.63 h | 8 h |
8/13 Owl | 6.49 h | 0.30 h | 1.20 h | 7.93 h |
Total | 13.70 h | 1.76 h | 8.53 h | 23.93 h |
Shift Reports
Reports
- Harp scans: IHA5C11, IHA5C11B, our harp, convergence fits; looks very good, much better than scans from last night.
Issues
Plans
Saturday
Shift | ABU | BANU | BNA | ER |
---|---|---|---|---|
8/13 Day | 6.16 h | 0.14 h | 1.70 h | 7.87 h |
8/13 Swing | 4.80 h | 0.38 h | 2.82 h | 7.93 h |
8/14 Owl | 6.75 h | 0.29 h | 0.97 h | 7.9 h |
Total | 17.71 h | 0.81 h | 5.49 h | 23.70 h |
Shift Reports
Issues
- one locked up FCAL base; shift crew followed reset procedure
Sunday
Shift | ABU | BANU | BNA | ER |
---|---|---|---|---|
8/14 Day | 6.46 h | 0.21 h | 1.33 h | 7.82 h |
8/14 Swing | h | h | h | h |
8/15 Owl | h | h | h | h |
Total | h | h | h | h |
Shift reports