Difference between revisions of "JEF meeting, August 5, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 14: | Line 14: | ||
*** Cleaning brass assemblies | *** Cleaning brass assemblies | ||
*** Gluing light guides | *** Gluing light guides | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 664 |
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | *** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS) | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 19:13, 4 August 2022
Meeting time and location=
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Preparation of parts[1][2][3]
- Preshaping ESR foils (with the DSG)
- Wrapping crystals (with the DSG)
- Preparing Silicon cookies
- Module fabrication
- Cleaning brass assemblies
- Gluing light guides
- Wrapped CRYTUR crystals: 664
- All currently available (consider to borrow some spares from NPS)
- Preparation of parts[1][2][3]
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1064
- All SICCAS 577 SICCAS
- 487 CRYTUR, Remaining: 167
- Clean room EEL126
- Light Monitoring System -- Arshak