|
|
Line 9: |
Line 9: |
| [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] |
| | | |
− | = Wednesday July 20 =
| |
| | | |
− | === Past 24 hours ===
| |
− |
| |
− | * [https://logbooks.jlab.org/entry/4017435 FCAL FADC250 replaced]
| |
− | * [https://logbooks.jlab.org/entry/4017475 Changed to Empty Target] (Ilya)
| |
− | * Production on Empty Target 60 nA (~0.4 B events)
| |
− | * Evening showers dropped beam about 7 pm. Arc 3 Power Supply died (in service building that overheated this weekend)
| |
− | * [https://logbooks.jlab.org/entry/4017706 1 am: No beam for the night]
| |
− | * [https://logbooks.jlab.org/entry/4017730 Solenoid ramp down started] (Tim)
| |
− | * [https://logbooks.jlab.org/entry/4017747 Accelerator Maintenance Day]. Swap in spare box supply ~ 8 hrs.
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4017431 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017575 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017671 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017723 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4017400 FCAL Flash250 Replaced] (Karthik). Thanks to Chris Stanislav, Sergey and Mark Dalton for fixing the problem.
| |
− | * [https://logbooks.jlab.org/entry/4017369 Translation Table rocfdc11 slot 3->19] (Justin)
| |
− | * [https://logbooks.jlab.org/entry/4017533 Update on pi0 peak] (Beni)
| |
− | * [https://logbooks.jlab.org/entry/4017550 Trigger rates with empty target] (Yannic)
| |
− | * [https://logbooks.jlab.org/entry/4017767 Trigger with missing FCAL module] (Sasha)
| |
− |
| |
− | === Issues and Features ===
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− | * [https://logbooks.jlab.org/entry/4017357 Tagger Hodoscope channels turned off]
| |
− | * [https://logbooks.jlab.org/entry/4017713 FMWPC gas low], [https://logbooks.jlab.org/entry/4017721 gas changed out], [https://logbooks.jlab.org/entry/4017733 status], [https://logbooks.jlab.org/entry/4017742 bottles changed out]
| |
− |
| |
− | === Plans ===
| |
− |
| |
− | * Accelerator maintenance day.
| |
− | ** Ramp down solenoid to 0 A to do cryogenic maintenance. (Tim coordinating with Jonathan Creel)
| |
− | ** Investigation of ROCFDC11 Slot 19 FADC125?
| |
− | ** Investigate FMWPC gas supply?
| |
− | ** [https://logbooks.jlab.org/entry/4017006 FCAL bases maintenance]
| |
− | ** [https://mailman.jlab.org/pipermail/halld/2022-July/000996.html Safety Walkthrough at 12:30 pm]. Sign up.
| |
− | ** Take Harp Scans. Solenoid should be back 7-8 pm.
| |
− | ** Continue running with Empty Target
| |
− |
| |
− | = Tuesday July 19 =
| |
− |
| |
− | === Past 24 hours ===
| |
− |
| |
− | * Production on Full Pb target 30 nA (~2.8 B events)
| |
− | * At noon ROCFDC11 Slot 19 failed to respond and Sergey took the module out of the configuration. A hall access was not able to fix the problem. (Issue is ongoing)
| |
− | * At about 2 am, Flas250 module in FCAL died. Chris Stanislav replaced it at about 7:30 this morning. Sergey is getting DAQ back up.
| |
− | * [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] - Maintenance Day on Wednesday
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4016998 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017085 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017205 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4017283 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4016986 Web browser with hodps]
| |
− | * [https://logbooks.jlab.org/entry/4017188 Reconstruction observations] (Sean)
| |
− |
| |
− | === Issues and Features ===
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− | * [https://logbooks.jlab.org/entry/4012390 Translation table for rocfdc11] (Justin)
| |
− | * ROCFDC11 FADC125 slot19 problems (Sergey)
| |
− | * [https://logbooks.jlab.org/entry/4017263 FCAL FADC250 board died]
| |
− | * [https://logbooks.jlab.org/entry/4017266 Example monitoring plots] Physics distributions may be compromised.
| |
− |
| |
− | === Plans ===
| |
− |
| |
− | * Production data on Full Pb target
| |
− | * Accelerator will do a 1 hr test plan at 10 am.
| |
− | * Change to Empty Target
| |
− | * Tomorrow:
| |
− | ** Safety Walkthrough at 12:30 pm
| |
− | ** Investigation of ROCFDC11 Slot 19 FADC125?
| |
− | ** Possible ramp down of solenoid to 800 A to do cryogenic maintenance.
| |
− |
| |
− | = Monday July 18 =
| |
− |
| |
− | === Past 24 hours ===
| |
− |
| |
− | * Production on Full Pb target 30 nA (~3.4 B events)
| |
− | * Hall C now running at 65 uA. Total beam trips 16/hr, RF trips 10/hr, which is fairly good.
| |
− | * [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] - Maintenance Day on Wednesday
| |
− | * Doug: Request for schedule update is in progress. Official approval underway; no issues expected.
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4016647 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016734 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016802 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016872 Early Riser shift summary]
| |
− |
| |
− | === (Proposed) Guidelines ===
| |
− | * Half-wave plate changes: End the current run. Make a separate log entry indicating new position of HWP (in/out). Start a new run
| |
− | * Day shift: Check FMWPC gas pressure. Make a separate log entry with current pressure.
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4016676 Current Statistics for CPP-NPP Run] (Albert)
| |
− | * [https://logbooks.jlab.org/entry/4016924 Beam position stability on AC] (Beni)
| |
− | * [https://logbooks.jlab.org/entry/4016671 pi0 update] (Beni)
| |
− | * [https://logbooks.jlab.org/entry/4016921 Rate monitoring] (Alexandre)
| |
− | * [https://logbooks.jlab.org/entry/4016405 Last 3 fa125 itrig errors occurred at event 199961. Go figure.] (Naomi)
| |
− |
| |
− | === Issues and Features ===
| |
− | * Stability of beam position at Active Collimator
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− | * [https://logbooks.jlab.org/entry/4016899 DAQ windows not updating until window is selected]
| |
− | * [https://logbooks.jlab.org/entry/4016770 FCAL Base lockup]
| |
− | * [https://logbooks.jlab.org/entry/4012390 Translation table for rocfdc11] (Justin)
| |
− |
| |
− | === Plans ===
| |
− |
| |
− | * Production data on Full Pb target
| |
− | * Decide when to go to Empty Target
| |
− |
| |
− | = Sunday July 17 =
| |
− |
| |
− | === Past 24 hours ===
| |
− |
| |
− | * Production on Full Pb target 30 nA (~2.1 B events)
| |
− | * Hall C is now running at 65 uA.
| |
− | * Accelerator problems in the evening
| |
− | ** Evening temperatures impacted cooling in building #38 (South Linac - east end). Supplementary cooling was added and stabilized the situation, but facilities may need to help with additional cooling. The are indicators of challenges of running through the summer.
| |
− | ** Thunderstorms affect operation; root causes are not known. Possible causes (Jay): 1. u-phonics induced by the thunderstorms, C-100 cryomodules not adequately damped for 10-80 Hz vibrations, coupled to waveguides to upstairs. 2. Imperfect grounding. 3. micros electrical discharges affecting low level RF. 4. Long helix master RF cable running to south linac in water-filled trough.
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4016315 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016409 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016462 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016545 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/comment/reply/1089411 CDC pressure drifts]
| |
− |
| |
− | === Issues and Features ===
| |
− | * Stability of beam position at Active Collimator
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− | * (Minor) DAQ problems Early Riser Sat, Owl Sunday
| |
− |
| |
− | === Plans ===
| |
− |
| |
− | * Production data on Full Pb target
| |
− |
| |
− | = Saturday July 16 =
| |
− |
| |
− | === Past 24 hours ===
| |
− |
| |
− | * Production on Empty target 60 nA (~1.1 B events)
| |
− | * Hall Access
| |
− | ** [https://logbooks.jlab.org/entry/4016008 Inserted Pb target] (Ilya)
| |
− | ** [https://logbooks.jlab.org/entry/4015979 Changed one FCAL base] (Malte/Mark)
| |
− | ** [https://logbooks.jlab.org/entry/4016032 Switched SD boards between FDC crates 11 and 12] (Cody/Ben)
| |
− | * Harp Scans
| |
− | ** [https://logbooks.jlab.org/entry/4016065 IHA5C11]
| |
− | ** [https://logbooks.jlab.org/entry/4016066 IHA5C11B]
| |
− | ** [https://logbooks.jlab.org/entry/4016072 Goniometer]
| |
− | ** [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.288&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.9475&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.8761&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.048&harp5C11B_xsigma_err=0.07&harp5C11B_usigma=0.8293&harp5C11B_usigma_err=0.06&harp5C11B_ysigma=0.8473&harp5C11B_ysigma_err=0.15&radHarp_xsigma=1.075&radHarp_xsigma_err=0.02&radHarp_usigma=1.044&radHarp_usigma_err=0.02&radHarp_ysigma=0.7626&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Extrapolation]
| |
− | * Production on Full Pb target 30 nA (~2.1 B events)
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4015852 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016029 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016155 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4016232 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | *
| |
− |
| |
− | === Issues and Features ===
| |
− |
| |
− | * [https://logbooks.jlab.org/entry/4015955 FA125 itrig errors R101072], [https://logbooks.jlab.org/entry/4016032 SD cards swapped] [https://logbooks.jlab.org/entry/4016094 FA125 itrig errors R101076]
| |
− | * Stability of beam position at Active Collimator
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− |
| |
− | === Plans ===
| |
− |
| |
− | * Production data on Full Pb target
| |
− |
| |
− | = Friday July 15 =
| |
− |
| |
− | === Past 24 hours ===
| |
− |
| |
− | * [https://logbooks.jlab.org/entry/4015174 RF Recovery Day]
| |
− | ** Productive Recovery
| |
− | ** Slow orbit drifts investigated. Source: changing up of a screen. Longterm solution will be implemented with long shutdown, requires vacuum work. Short-term: increase apertures, possibly this weekend.
| |
− | ** Restoring to more stable configuration. Delivered 70 uA to Hall C for short period and ran 48 uA overnight.
| |
− | ** RF trips at about 13 trips/hr.
| |
− | * Maintenance
| |
− | ** Access to investigate DIRC environment parameters (Nick)
| |
− | ** Access to install crystals for testing in the PS Test Setup (Vlad and Sasha)
| |
− | ** [https://logbooks.jlab.org/entry/4015311 DIRC Environment] (Tim)
| |
− | ** [https://logbooks.jlab.org/entry/4015417 Recycled power on BCAL LED crate] (Elton/Mark)
| |
− | ** [https://logbooks.jlab.org/entry/4015489 FCAL Base Replaced] (Malte/Mark]
| |
− | * [https://logbooks.jlab.org/entry/4015319 Program when beam comes back]
| |
− | * [https://logbooks.jlab.org/entry/4015508 Solenoid ramped up to 1350 A] (Tim)
| |
− | * Beam back about 9 pm.
| |
− | * Production on Empty target 30 nA (~0.08 B events)
| |
− | * Production on Empty target 60 nA (~1 B events)
| |
− |
| |
− | === Shift Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4015226 Day shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4015409 Swing shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4015548 Owl shift summary]
| |
− | * [https://logbooks.jlab.org/entry/4015641 Early Riser shift summary]
| |
− |
| |
− | === Reports ===
| |
− | * [https://logbooks.jlab.org/entry/4015304 Single pi0 production] (Beni)
| |
− | * [https://logbooks.jlab.org/entry/4015449 omega signal in FCAL] (Simon)
| |
− |
| |
− | === Issues and Features ===
| |
− | * Stability of beam position at Active Collimator
| |
− | * [https://logbooks.jlab.org/entry/4015260 itrigger errors in monitoring plots]
| |
− | * [https://logbooks.jlab.org/entry/4015255 Hydra not running] (Naomi)
| |
− | * Add the TOF and CTOF trigger rates to EPICs/archiver
| |
− |
| |
− | === Plans ===
| |
− | * Need about 6 hours to complete present cycle on empty target.
| |
− | * Insert Full Target Pb (mid afternoon)
| |
− | * Change SD card in FDC crate if Cody is available.
| |
− | * Harp scans
| |
− | * Production
| |
| | | |
| = Thursday July 21 = | | = Thursday July 21 = |