Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Thursday July 14) |
|||
Line 17: | Line 17: | ||
=== Shift Reports === | === Shift Reports === | ||
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4014893 Day shift summary] [https://logbooks.jlab.org/entry/4014831 Part II] |
− | + | * [https://logbooks.jlab.org/entry/4014931 Swing shift summary] | |
− | * [https://logbooks.jlab.org/entry/ | + | * [ Owl shift summary] |
− | * [ | + | * [ Early Riser shift summary] |
=== Reports === | === Reports === |
Revision as of 19:47, 13 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday July 14
Past 24 hours
- Production on lead (~2.7B events)
- trigger changed around 10 pm, first run with the updated trigger 101033
Shift Reports
- Day shift summary Part II
- Swing shift summary
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
- Trigger has been modified [1]
- Scans (7.30 pm [2], 9 pm [3])
- Collimator scan (Hovanes)[4] (result [5], xtrapolation [6]); MWPC was tripping(?)
- Beam asym. monitor. fixed [7]
- Slight improvement in Y-position stability [logentry from Matt Mock https://logbooks.jlab.org/entry/4014665]
- Night beam strip chart [8]
Issues
Plans
- Switch to empty target this afternoon
- RF Recovery Thursday (beam down 8.15 till ~5pm)