Difference between revisions of "Run Planning Meeting Notes, July 07 - July 14, 2022"
From GlueXWiki
(→Past 72 hours) |
(→Shift reports) |
||
Line 44: | Line 44: | ||
* [https://logbooks.jlab.org/entry/4013580 Sunday swing shift summary] | * [https://logbooks.jlab.org/entry/4013580 Sunday swing shift summary] | ||
* [https://logbooks.jlab.org/entry/4013649 Sunday owl shift summary] | * [https://logbooks.jlab.org/entry/4013649 Sunday owl shift summary] | ||
− | * [ Monday early riser shift summary] | + | * [https://logbooks.jlab.org/entry/4013717 Monday early riser shift summary] |
=== Reports === | === Reports === |
Revision as of 08:17, 11 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Friday July 8 - Sunday July 10
Past 72 hours
- 6B events on lead have been collected
- FMWPC 1 noise level increased yesterday evening, past distributions for comparison:
- DAQ livetime looks much better after switching to writing data in two files simultaneously
- Friday evening harp scan [8] [9] extrapolation
- Sunday morning harp scan 5C11 5C11B [10] extrapolation
- Hall-D strip charts
Shift reports
- Friday day shift summary
- Friday swing shift summary
- Friday owl shift summary
- Saturday early riser shift summary
- Saturday day shift summary
- Saturday swing shift summary
- Saturday owl shift summary
- Sunday early riser shift summary
- Sunday day shift summary
- Sunday swing shift summary
- Sunday owl shift summary
- Monday early riser shift summary
Reports
Issues
Plans
- Continue production on lead
- unmask FCAL modules in the trigger
Thursday July 7
Past 24 hours
- harp scans were done during short beam on period during day-time, some distributions show 1/100 peak/shoulders ratio others 1/10,000 [14] [15]
- Dominion Power's work required a voltage reduction so we had tagger, PS and sweep magnets off for a couple of hours
- collected cosmics and LED runs during daytime, and production on lead (about 8 hrs) during night time
- Beni: beam was quite stable overnight [16]
Shift reports
Reports
- Sasha checked FCAL trigger rate without masking inner layers. Preliminary result for the rate was 14kHz [17]
- Hovanes pointed out, that we don't observe 60Hz oscillations now [18]
Issues
- Problems with running at 30nA on AMO, radiator thickness was reduced to 3*10^-4 this night,
as 4.5*10^-4 was causing IOC trips [19] [20]
- Alexandre just noticed that Tagger magnet NMR communication is down again [21]
- DIRC major alarm has been acknowledged [22], Mark may need to investigate this issue more
- Dave has noticed we have a higher radiation level values now, about factor of 1.5 [23], [24]
- Hydra alarm on fa125_itrig [25]
- daq livetime is uneven from time to time [26]
Plans
- Continue production on lead
- find out the way to unmask FCAL modules
Wednesday, July 6
Past 24 hours
- Malte and Mark worked on FCAL bases replacement [27]
- One of the RF crates had been disconnected, Beni fixed it [28]
- Bobby and others worked in the tagger hall during the day. At 3:30 pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterward, it was still locked on zero and there was still a Comm Status error [29]
- Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
- Had minor issues with DAQ at 7.00 pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during daytime [30]) Sergei worked out the DAQ issue at 7.50 pm
- Established operating field of the solenoid at 8:30 pm.
- harp scans are ongoing now
Shift reports
Reports
- Sergey and Lubomir worked in the Hall this night from 10 pm to 11:30 pm [31]
- Hovanes reported his study of the coherent peak position drifts observed on the 4th of July [32]
- Still have 60Hz structure [33]. The situation is improved according to MCC experts.
- CDC HV and TAGM alarms are more frequent now
- CDC gas flow increased [34]
Issues
Plans
- Continue production on lead
- Unmasking FCAL central modules from the trigger needs to be done unless it increases rate too high