Line 36: | Line 36: | ||
=== Issues === | === Issues === | ||
− | * Hovanes pointed out that something strange happened during solenoid ramping up [https://logbooks.jlab.org/entry/4011909] | + | * Hovanes pointed out that something strange happened during solenoid ramping up [https://logbooks.jlab.org/entry/4011909] [https://logbooks.jlab.org/entry/4012078] |
=== Plans === | === Plans === | ||
* Continue production on lead | * Continue production on lead | ||
* Unmasking FCAL central modules from the trigger needs to be done unless if increases rate too high | * Unmasking FCAL central modules from the trigger needs to be done unless if increases rate too high |
Revision as of 07:40, 7 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Wednesday July 7
Past 24 hours
- Malte and Mark worked on FCAL modules replacement [1]
- One of the RF crates had been disconnected, Beni fixed it [2]
- Bobby and others worked in the tagger hall during the day. At 3:30pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterwards, it was still locked on zero and there was still a Comm Status error [3]
- Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
- Had minor issues with DAQ at 7.00pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. (fADC125 in fdc11 slot 3 was replaced during day time [4]) Sergei worked out the DAQ issue at 7.50pm
- Established operating field of solenoid at 8:30pm.
- production data taking continued on Pb
Shift reports
- day shift summary
- swing shift summary
- owl shift summary
- [ early riser shift summary]
Reports
- Sergey and Lubomir worked in the Hall this night from 10 pm to 11:30 pm [5]
- Hovanes reported his study of the coherent peak position drifts observed on the 4th of July [6]
- Still have 60Hz structure [7]
- CDC HV and TAGM alarms are more frequent now
Issues
Plans
- Continue production on lead
- Unmasking FCAL central modules from the trigger needs to be done unless if increases rate too high