Difference between revisions of "Run Planning Meeting Notes, July 07 - July 14, 2022"
From GlueXWiki
(→Reports) |
(→Issues) |
||
Line 31: | Line 31: | ||
=== Issues === | === Issues === | ||
− | * | + | * Hovanes pointed out that something strange happened during solenoid ramping up [https://logbooks.jlab.org/entry/4011909] |
− | + | ||
=== Plans === | === Plans === |
Revision as of 21:57, 6 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Wednesday July 7
Past 24 hours
- Malte and Mark worked on FCAL modules replacement [1]
- One of the RF crates had been disconnected, Beni fixed it [2]
- Bobby and others worked in the tagger hall during the day. At 3:30pm Bobby noticed that the IOC for the NMR was not responding properly. MCC rebooted the IOC crate. Afterwards, it was still locked on zero and there was still a Comm Status error [3]
- Beni found that the solenoid controls hung, and restarted the ramping, which was helpful.
- Had minor issues with DAQ at 7.00pm: ROCFDC11 error: timeout error on FA125, every 3 seconds. Sergei worked it out at 7.50pm
- Established operating field of solenoid at 8:30pm.
- production data taking continued on Pb
Shift reports
- day shift summary
- swing shift summary
- [ owl shift summary]
- [ early riser shift summary]
Reports
Issues
- Hovanes pointed out that something strange happened during solenoid ramping up [4]
Plans
- maintenance day: beam will go away 7:30am, 8 hours maintenance, followed by beam restoration and high current beam tuning for HallC
- please access hall after 9am: other halls have priority
- ramp solenoid to 800A for cyro comprssor swtch
- FCAL base replacement
- Tagger NMR inspection
- Fix TOF RF signal