Difference between revisions of "JEF meeting, May 13. 2022"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
** [https://halldweb.jlab.org/detectors/fcal2/budget/students1.xlsx Status of Summer Students (2022) ] | ** [https://halldweb.jlab.org/detectors/fcal2/budget/students1.xlsx Status of Summer Students (2022) ] | ||
** [[Hotels summer 2022]] | ** [[Hotels summer 2022]] | ||
+ | ** DSG: | ||
+ | *** preshaping 910 (SICCAS), 40 (CRYTUR) | ||
+ | *** wrapping 20 per week | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Fabricated modules] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 411 (25 % of the total ) </span> | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Fabricated modules] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] <span style="color:#FF0000"> Grand total 411 (25 % of the total ) </span> |
Revision as of 09:28, 13 May 2022
meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- Status of Summer Students (2022)
- Hotels summer 2022
- DSG:
- preshaping 910 (SICCAS), 40 (CRYTUR)
- wrapping 20 per week
- Module fabrication -- Sasha
- Fabricated modules (list on Google Drive) Grand total 411 (25 % of the total )
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System -- Arshak
- Data analysis
- Simulations
- Workshops/external meetings
- DNP 2022 fall meeting: DNP 2022 web site
- Proposed ECT* (https://www.ectstar.eu/) workshop