Difference between revisions of "BLTWG Meeting 12/18/2008"
From GlueXWiki
(→Notes) |
(→Notes) |
||
Line 17: | Line 17: | ||
# Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]] | # Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on [[Pair_Spectrometer|the pair spectrometer wiki page]] | ||
+ | # There was discussion about finding a package of work that might be suitable for writing a MOU with the YERPHI group. We are looking for a set of engineering and construction tasks that can be specified clearly and the work can proceed relatively independently. |
Revision as of 11:31, 18 December 2008
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: R. Jones, J. Stewart, T. Whitlatch, I. Senderovich, A. Somov
Agenda
- Changes to the November Review wiki page
- Comparison between ANSYS and TOSCA fields
- Goals for diamond assessment at CHESS in 3/2009
- Budget changes for tagger hodoscope
Notes
- Alex has redone his Pair Spectrometer simulations and has updated plots on the energy resolution -- see the Geant simulations section on the pair spectrometer wiki page
- There was discussion about finding a package of work that might be suitable for writing a MOU with the YERPHI group. We are looking for a set of engineering and construction tasks that can be specified clearly and the work can proceed relatively independently.