Difference between revisions of "April 21, 2022 CPP Design/Install Meeting"
From GlueXWiki
Line 14: | Line 14: | ||
* Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_07,_2022_CPP_Design/Install_Meeting#Minutes | * Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_07,_2022_CPP_Design/Install_Meeting#Minutes | ||
* Installation Status | * Installation Status | ||
− | ** Detector installed, paddles installed [[image:CPP_Paddles_install.png|thumb]] | + | ** Detector installed, paddles installed and repaired [[image:CPP_Paddles_install.png|thumb]] |
** Cabling | ** Cabling | ||
− | ** Microscope | + | ** Microscope/hodoscope complete - Hodo#7 4mm high |
− | + | ** Target - fiducialized [[image:Target1.jpg|thumb]] and targets in hand | |
− | ** Target - | + | |
** Vacuum | ** Vacuum | ||
** Gas | ** Gas | ||
* 3x3 Crystal TAC - Bobby working with Sasha [[image:TAC.png|thumb]] | * 3x3 Crystal TAC - Bobby working with Sasha [[image:TAC.png|thumb]] | ||
− | ** need many cables - should limit X motion | + | ** need many cables - should limit X motion - we have 8 of 9 cables? |
** Air cooled | ** Air cooled | ||
** supported on TAC base plate [[Media:CPP_TAC.pdf]] | ** supported on TAC base plate [[Media:CPP_TAC.pdf]] | ||
− | * Adjustable Lead - | + | * Adjustable Lead - procedure being made [[image:Adj_Lead.png|thumb]] |
* Helium Bag inside CDC [[Media:Hebag.jpg]] | * Helium Bag inside CDC [[Media:Hebag.jpg]] |
Revision as of 13:40, 21 April 2022
Meeting Time and Place
Thursday April 21, 2022, 3:00pm
Zoom Meeting
https://jlab-org.zoomgov.com/j/1602846419?pwd=YTNEeXI3aHBKSERjMGpsTVJZd25sQT09&from=addon
Meeting ID: 160 284 6419 Passcode: 459361
- Invited - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I, Anthony, Alex S., Eugene
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/April_07,_2022_CPP_Design/Install_Meeting#Minutes
- Installation Status
- Detector installed, paddles installed and repaired
- Cabling
- Microscope/hodoscope complete - Hodo#7 4mm high
- Target - fiducialized and targets in hand
- Vacuum
- Gas
- 3x3 Crystal TAC - Bobby working with Sasha
- need many cables - should limit X motion - we have 8 of 9 cables?
- Air cooled
- supported on TAC base plate Media:CPP_TAC.pdf
- Adjustable Lead - procedure being made
- Helium Bag inside CDC Media:Hebag.jpg