Difference between revisions of "Dec 17, 2008 BCAL Construction"
From GlueXWiki
Line 15: | Line 15: | ||
= Documents to Review = | = Documents to Review = | ||
− | # Dan's corner block: [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:MeasuringBlock.jpg [http://www.jlab.org/~whitey/BCAL/BCal_Measuring_Sys.pdf Dan's updated measuring layout] | + | # Dan's corner block: [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:MeasuringBlock.jpg image][http://www.jlab.org/~whitey/BCAL/BCal_Measuring_Sys.pdf Dan's updated measuring layout] |
# Updated Wedge drawing: [http://www.jlab.org/~whitey/BCAL/WEDGE_MACH_12-10-08.pdf Latest wedge machined dwg] | # Updated Wedge drawing: [http://www.jlab.org/~whitey/BCAL/WEDGE_MACH_12-10-08.pdf Latest wedge machined dwg] | ||
# Updated Base plate drawing: [http://www.jlab.org/~whitey/BCAL/BASE_PLT_12-10-08.pdf Latest base plate dwg] need to remove inserts for machining | # Updated Base plate drawing: [http://www.jlab.org/~whitey/BCAL/BASE_PLT_12-10-08.pdf Latest base plate dwg] need to remove inserts for machining |
Revision as of 13:36, 17 December 2008
Contents
Teleconference Instructions
Meeting time 13:00-14:00 Newport News / 12:00-13:00 Regina / 11:00-12:00 Edmonton
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Quick Reference Links
Documents to Review
- Dan's corner block: imageDan's updated measuring layout
- Updated Wedge drawing: Latest wedge machined dwg
- Updated Base plate drawing: Latest base plate dwg need to remove inserts for machining
Action Item List
-
Tim will supply updated drawings and post on DocDB by this friday -
Gilbert will submit a list of all tools required and cost estimates by middle of next week. - Gilbert will send a drawing of the machining set up for jlab to reference.
- Detailed schedule for preparation for module production (Gilbert).
- Tim to supply 3d stp file for NC programming to Gilbert and Jan.
- In progress: George submitted a QA plan last month. Needs to be reviewed by Tim and Elke.
- Manpower
- Construction Manager: Progress at UofA on job description, job ad
- Co-Op job ads
Tentative Agenda
- Announcements: Pb-vendor responses (Tim)
- Corner block concept: indexing during machining at Ross (Dan)
- Go-nogo Gauge: discuss concept/implementation (Jan/Gilbert)
- Installation: how to lift matrix from Al base plate off steel beam
- Latest changes to drawings
- Review action item list
- Other business
Minutes
Attendees: Regina - Zisis, George, Andrei, Dan, Keith, Alberta - Gilbert, Jan, Richard, JLAB - Elke, Elton, Tim