Difference between revisions of "CPP and NPP Run Conditions"
From GlueXWiki
Line 4: | Line 4: | ||
|+ Preliminary Run Plan | |+ Preliminary Run Plan | ||
|- | |- | ||
− | ! Activity !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator | + | ! Activity !! Duration (PAC Days) !! Current !! Target !! Collimator !! Radiator !! Comment |
|- | |- | ||
− | | Production || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 | + | | Full target (Production) || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || |
|- | |- | ||
− | | TAC Runs || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 | + | | Empty Target || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || |
+ | |- | ||
+ | | Diamond Alignment || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || | ||
+ | |- | ||
+ | | Trigger Commissioning || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || | ||
+ | |- | ||
+ | | Beam Energy Calibration || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || | ||
+ | |- | ||
+ | | TAC Runs || 20 || 27 || Pb (0.3 mm) || 3.4 || JD70-103 / JD70-107 || | ||
|} | |} | ||
Revision as of 08:31, 15 March 2022
Activity | Duration (PAC Days) | Current | Target | Collimator | Radiator | Comment |
---|---|---|---|---|---|---|
Full target (Production) | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Empty Target | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Diamond Alignment | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Trigger Commissioning | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
Beam Energy Calibration | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 | |
TAC Runs | 20 | 27 | Pb (0.3 mm) | 3.4 | JD70-103 / JD70-107 |
Header text | Header text | Header text |
---|---|---|
Example | Example | Example |
Example | Example | Example |
Example | Example | Example |