Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
|||
Line 9: | Line 9: | ||
** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21. | ** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21. | ||
** Chris continues to braze brass strap assemblies | ** Chris continues to braze brass strap assemblies | ||
− | ** Bobby has started working on honing soft iron PMT housing ( | + | ** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings) |
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month) | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month) |
Revision as of 00:38, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21.
- Chris continues to braze brass strap assemblies
- Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) (grand total 115, fabricated in about a month)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah