Difference between revisions of "January 21, 2022 Tech group SAD meeting"
From GlueXWiki
(→Meeting Time and Place =) |
(→Agenda) |
||
Line 9: | Line 9: | ||
* Hall D SAD Tasks | * Hall D SAD Tasks | ||
** CPP INstall O:\halld_engineering\Installation Schedules | ** CPP INstall O:\halld_engineering\Installation Schedules | ||
− | *** Microscope move | + | *** Microscope move - Mostly completed - will need to re-install Hodoscope once tested |
− | *** Platform mods | + | *** Platform mods - completed |
*** Lead absorber | *** Lead absorber | ||
*** Move Chambers to Hall for Beni/Elton to check HV on wires | *** Move Chambers to Hall for Beni/Elton to check HV on wires | ||
+ | *** Bring stand to hall | ||
** Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms | ** Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms | ||
** Goniometer Maintenance/Diamonds? | ** Goniometer Maintenance/Diamonds? | ||
** PS Parasitic Detectors stages? | ** PS Parasitic Detectors stages? | ||
− | ** DIRC | + | ** DIRC Resurrection - Justin to come in Tuesday to look at test pieces |
− | ** FCAL Insert Module fabrication | + | ** FCAL Insert Module fabrication ? |
− | ** Tagger NMR repair | + | ** Tagger NMR repair - RMA available |
** FDC chiller repair | ** FDC chiller repair | ||
** BCAL Coldshot Chiller commissioning | ** BCAL Coldshot Chiller commissioning | ||
** Target Turbo repair | ** Target Turbo repair | ||
+ | ** TEDF move in late March-early April | ||
* JT file creation | * JT file creation | ||
* FCAL Insert Drawings | * FCAL Insert Drawings |
Revision as of 08:23, 21 January 2022
Meeting Time and Place =
Thursday January 21, 2022 at 8:00 am Hall D Counting House
Zoom https://jlab-org.zoomgov.com/j/1601557064?pwd=NkF5d1BOdm1INHE4Vkw0NXpMT00rZz09&from=addon#success
Agenda
- Safety - CPP Stand install
- Hall D SAD Tasks
- CPP INstall O:\halld_engineering\Installation Schedules
- Microscope move - Mostly completed - will need to re-install Hodoscope once tested
- Platform mods - completed
- Lead absorber
- Move Chambers to Hall for Beni/Elton to check HV on wires
- Bring stand to hall
- Solenoid Warm Up/Cool Down - 62K - lots of nitrogen liquid level alarms
- Goniometer Maintenance/Diamonds?
- PS Parasitic Detectors stages?
- DIRC Resurrection - Justin to come in Tuesday to look at test pieces
- FCAL Insert Module fabrication ?
- Tagger NMR repair - RMA available
- FDC chiller repair
- BCAL Coldshot Chiller commissioning
- Target Turbo repair
- TEDF move in late March-early April
- CPP INstall O:\halld_engineering\Installation Schedules
- JT file creation
- FCAL Insert Drawings
- General Maintenance
- On Call - Bobby
- ePAS Training and trial https://www.jlab.org/esh/epas
Action Items
- NMR controller repair
- Set up PS leach meeting
- Decide on Goni maintenance